In-house manufacturing
You buy the machines, hire the staff and run the factory yourself.
- Full control of the process
- Lowest unit cost at very high volumes
- Large upfront investment
- You carry machine downtime and staffing
In-house production, a local job shop, a trader, an overseas import or a factory-direct contract manufacturer? Compare cost, control, quality and lead time, and find the option that fits your parts.
Contract manufacturing means another company makes parts to your design, so you avoid buying machines and running a factory. Which option suits you depends on volume and urgency:
The options Indian businesses weigh up when they need parts made to their drawing.
Swipe the table sideways to see every option →
| Comparison | In-house manufacturing | Local job shop | Trader or distributor | Imported from overseas | RTechSoftGen factory-direct |
|---|---|---|---|---|---|
| Upfront investment | Very high: machines, staff and space | None | None | None | None |
| Who makes your part | Your own team | The local shop | A workshop the trader selects | An overseas factory, often unvetted | Our own factory |
| Markup on factory price | None | None | Trader margin added | Agent margin, customs duty and clearance added | None, factory-direct |
| Cost per part at volume | Low once running at scale | Highest | Medium, plus trader margin | Low unit price, but duty and freight added | Low, factory-direct |
| Moulds and dies | Build or buy yourself | Often outsourced | Arranged by the trader | Varies by supplier | Built in our own toolroom |
| Tooling ownership | Yours | Usually yours | Often unclear | Varies by supplier | Yours, stored for reruns |
| Freight and GST | Not needed | Freight usually extra | Varies by trader | Sea freight, customs duty and clearance billed separately | Freight included, GST on invoice |
| Quality evidence | Your own QA | Varies by shop | Depends on the factory | Varies by supplier | Inspection report with every order |
| Typical lead time | Fastest once set up | Fastest for small, urgent jobs | Varies | Longest: production, sea freight and clearance | 3–6 weeks to your door |
| Point of contact | Your own team | The shop owner | The trader | An overseas sales contact | One dedicated project engineer |
| Best when | Very high volumes or a core process you must control | Urgent one-offs and local repairs | Buying across many product categories | Large volumes of simple parts, if you can manage import logistics | Repeat production, especially parts needing moulds or dies |
General comparison. Individual shops, traders and overseas suppliers vary.
The cheapest-looking price is not always the cheapest landed cost. Here is what each option typically includes, and what can arrive as a separate bill.
Shows which costs are typically included, not how large each one is.
Answer three questions for a starting recommendation.
Every option has a place. These are the honest trade-offs.
You buy the machines, hire the staff and run the factory yourself.
A nearby workshop machines or fabricates your parts.
A trader sources parts from workshops and factories and resells them to you.
You buy from an overseas factory and handle freight, customs clearance and duty yourself.
We build the tooling, make the parts in our own factory and deliver them to your plant with freight included.
One price agreed up front, and one project engineer the whole way.
CAD files or a PDF drawing, with quantity, material and finish.
One price delivered to your plant, a lead time and design notes within 48 hours.
Tooling and parts made in our own factory, with no middlemen in between.
Every batch measured against your drawing and documented in a report.
Dispatched with a GST invoice and delivered to your door.
Use this checklist when you compare quotes, whoever you end up working with.
Contract manufacturing is when another company makes parts or products to your design. You own the design and the customer relationship, and the contract manufacturer provides the equipment, tooling, skilled labour and production capacity.
Often, yes, because you avoid buying machines and running a factory. There is no fixed minimum for CNC machining, so prototypes and small batches are welcome. For moulding and casting, the tooling cost makes larger runs more economical, so your quote shows the unit price at different quantities.
A trader buys from workshops and factories and resells to you at a margin, and the source can change from one order to the next. A factory-direct contract manufacturer makes the parts in its own facility, so the company that quotes your part is the company that makes it.
With RTechSoftGen, you do. When you pay for tooling, it belongs to you. We store and maintain it for your repeat runs, and release it to you on request.
Every drawing you send is covered by our privacy agreement from the first message, used only to quote and make your parts, and never used for other customers. If your company requires an NDA, we sign yours or provide ours alongside your quote.
Freight to your plant is included in one price. GST is shown as a separate line on your tax invoice, so you can claim input tax credit where you are eligible.
Most orders arrive 3–6 weeks after you approve the quote, depending on the process. New moulds and dies add tool build and sample approval before production. Your quote gives a confirmed delivery date.
Send your files and we will come back with one price delivered to your plant, a lead time and any design notes.